Site Readiness Protocol & Installation Terms

The following conditions must be met prior to the arrival of the installation crew and crane. Failure to meet these requirements may result in rescheduling and additional mobilization fees.

  1. Minimum On-Site Requirements
  1. Foundation & Structural Readiness
  1. Access & Logistics

 

  1. Environmental & Safety Conditions
  1. Client Confirmations (The “Pre-Flight” Checklist)

48 hours prior to the scheduled delivery, the client must provide:

  1. Photo verification of the foundation and clear access path.
  2. GPS coordinates or a marked site map for the crane setup location.
  3. Signed confirmation that all anchor bolts have been verified against the template.